Skip To Main Content

Ballot Language

A modern, multi-story building with glass facades and a prominent sign reading %22Springfield Clark CTC%22 stands in the foreground, with a school bus and pedestrians visible in the surrounding area.

What does the ballot say?

The November 2024 General Election ballot draft language:
Proposed Bond Issue and Tax Levy

A majority affirmative vote is necessary for passage.
Springfield-Clark Career Technology Center (CTC) Joint Vocational School District (JVS)

Shall the Board of Education of the Springfield-Clark Career Technology Center (CTC), a joint vocational school district (JVS), Counties of Clark, Champaign, Miami and Greene, Ohio, be authorized to do the following:

(a) Issue bonds for the purpose of paying the costs of the local share of school construction under the State of Ohio Vocational School Facilities Assistance Program, together with, as applicable, new construction, improvements, renovations, and other additions to school facilities, as well as equipment, furnishings, site development and improvements, facilities for workforce development, safety and security measures, and all necessary appurtenances for the foregoing, as well as capitalized interest, in the principal amount of $59,000,000, to be repaid annually over a maximum period of 37 years, and an annual levy of property taxes to be made outside the “ten-mill” limitation, estimated by the county auditor to average over the repayment period of the bond issue 0.94 mills for each $1 of taxable value, which amounts to $33 for each $100,000 of the county auditor’s appraised value, commencing in 2024, first due in calendar year 2025, to pay the annual debt charges on the bonds, and to pay debt charges on any notes issued in anticipation of those bonds? and

(b) Levy an additional property tax to provide funds for general permanent improvements, that the county auditor estimates will collect $1,481,000 annually, at a rate not exceeding 0.46 mills for each $1 of taxable value, which amounts to $16 for each $100,000 of county auditor’s appraised value, for a continuing period of time, commencing in 2024, first due in calendar year 2025? 

For the Bond Issue and Levy
Against the Bond Issue and Levy

Voter and Voting Information

For complete and up-to-date information visit ClarkCountyAuditor.org to:

CTC By the Numbers

The image displays the text %22$1.2 MILLION%22 prominently in the center, with an icon of a dollar bill below it. The background is plain white, and the text and icon are in a blue color.
The image consists of numerous blue graduation cap icons arranged in a grid pattern, with the text %2297% of CTC graduates are employed, enlisted, or enrolled six months after graduation.%22 and %22CTC gets students READY!%22 displayed below.
The image depicts an icon representing career-tech education, with a person surrounded by symbols for a globe, book, and graduation cap. The text below states that career-tech education is in demand, with increasing student and employer interest in CTC (Career and Technical Centers), which aim to get students ready.
The image displays an icon representing a certificate or credential, along with text stating that CTC students earned over 1,300 industry credentials and certifications last school year, and that CTC gets students READY.
The image contains a graph-like icon with upward-trending bars, representing the increase in CTC applications. The text below the icon provides additional information about the significant increase in the number of students turning away for the 2024-25 school year.